SPECIFICATIONS

  • GENERAL
  • a) Floors - 14 Levels

    b) Architect - Genesis Planners PVL Ltd.

    c) Developers 8, Land Owners - Vasavi Nirrnan Pvt. Ltd. & MPM Group

    d) 1st Level - Hypermarket

    e) 2nd to 4th Level - Retail

    f) 51h 8, 6th Level - Restaurant with Banquet Hall / Office Space

    g) 7th to 14th Level - Office Space


  • STRUCTURE
  • a) Structure - RCC dab and column structure with masonry partitions


  • WINDOWS
  • a) Retail Units - Power coated Aluminium / UPVC windows - Rolling Shutters

    b) Office Units - Power coated Aluminium / UPVC windows - Doors


  • FLOORING
  • a) Retail Units - Vitrified flooring - 600 X 600mm

    b) Office Units - Vitrified flooring - 600 X 600mm

    c) Common Areas - Granite

    d) Lift - Cladding - marble/granite stone

    e) Staircase - Marble or granite stone

    f) Entrance Steps – Granite


  • POWER SUBSTATION
  • a) >Metering - Exclusive electncal energy measurement provided for retail and office by electronic meter

    b) Earthling pits - Provided

    c) Standby Power - Backup for common area and amenities (diesel generator)


  • HVAC AC
  • a) AC System - Provision for split AC units for offices

    b)            - Provision for centralized AC for commercial


  • WATER
  • a) Water supply - Municipal water/ Bore water for entire premises


  • LIFTS
  • a) Total - 8 lifts

    b) Passenger Lift - 7

    c) Service Lift – 1


  • FINISHES
  • a) Exterior - Front elevation with glass/ suitable. Combination of stone and painted surface

    b) Lobbies - Combination of stone and painted surface

    c) Basement - Broom finish concrete

    d) Office Units - Smooth luppam finish

    e) Common Toilets - Ceramic tiles with modem fittings and fixtures

    f) Railing - SS Railing


  • COMMUNICATIONS
  • a) Cable & intemet connection - Provision for cable TV, inbraet and telephone point


  • SECURITY
  • a) CCTV Surveillance - At Parking & all levels

    b) Manned Security - Boom barriers at all vehicular entry and exit points

    c) Monitoring - Monitored on-site


  • SAFETY
  • a) Wet/ Riser/ Ho. Reels / Sprinklers/

    b) Fire Extinguishers - Provided as per norms

    c) External Fire Hydrant - Provided as per norms

    d) Fire deduction system - Provided as per norms


  • TOILETS
  • Toilet facilities - Male & Female on every level


  • LANDSCAPE
  • a) Richly landscaped central plaza

    b) Pedestrian plaza designed with seating area and food kiosks

    c) Dedicated drop-off zone and entrances for retail

    d) On-site parking areas with lush canopy tress and landscape features


  • ACCESSIBIUTY
  • a) Parking - Adequate surface parking facility at multi-level basement with mechanical parking

    b) Valet Parking - Provision for valet parking